Copyright © 2024 Qingdao Pristine Steel Structures and Engineering Co.Ltd All Rights Reserved.
Powered by Hicheng
The structure of heavy duty pallet rack includes uprights and beams, According to the customer's actual pallet load capacity and warehouse size, select the column and beam specifications, as well as increasing racking accessories.
Premium Material Construction: Manufactured from high-grade Q235B cold-rolled steel, ensuring superior structural integrity and a long service life under heavy-load conditions.
Maximum Space Utilization: Designed to optimize vertical warehouse space, providing 100% accessibility to every pallet and increasing storage density significantly.
Heavy Loading Capacity: Engineered for industrial use, with a load-bearing range of 1000kg to 4000kg per level, customized to meet your specific inventory requirements.
Adjustable & Flexible Design: Features a boltless connection system. The beam height can be easily adjusted by 50mm or 75mm pitches, allowing for quick reconfiguration as your storage needs change.
Professional Surface Finish: Treated with an advanced automated electrostatic powder coating (Blue RAL5015 / Orange RAL2004). This provides a smooth, anti-corrosion, and scratch-resistant finish that maintains a professional look for years.
Enhanced Safety Features: Equipped with safety locking pins to prevent accidental beam displacement by forklifts and optional row spacers/upright protectors for maximum warehouse safety.
Easy Assembly & Maintenance: The modular structure allows for rapid installation with minimal tools and low maintenance costs over time.
Free CAD Design: We provide professional warehouse layout designs tailored to your floor plan.
Strict Quality Control: Every component undergoes load testing and welding inspection before dispatch.
Global Export Experience: Familiar with international shipping standards and installation support.
The following factors should be taken into consideration comprehensively when selecting warehouse racks:
Warehouse area and ceiling height
Dimension and weight of goods
Storage type (pallets, cartons or bulk goods)
Forklift model and aisle width
Inbound and outbound frequency
Future expansion requirements
| Type | Warehouse Rack, Boltless / Rivet Shelving | Material | Metal, Iron, Steel |
| Layer | 1 Layer, 2 Layer, 3 Layer, 4 layer, 5 Layer | Feature | Corrosion Protection, Heavy Duty, Adjustable |
| Surface Treatment | Painted | Installation | Card Slot Assembly |
| length of layers | Customized | Product name | Heavy Duty Pallet Rack With Metal |
| Color | Customized | Usage | Warehouse Storage |
| Size | Customer Size | Application | Goods Storage |
| Certification | CE/ISO9001 | Style | Heavy Duty Selective Shelf |
| Surface treatment | Powder Coating | Loading Capacity | 500-2000kgs |
| Packing | Customers' Request |
FAQ
1. You are manufacture factory or trading company?
We are manufacture factory build in 2002. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism.
2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings and video for free. We can send engineers as installation director or a team upon request.
4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall, 5 star hotel.
6. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 20 to 30 days after receiving deposit.